• Front Range Insurance - EIFS Questionaire

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 2. Do employees have product-specific training?*
  • 5. Does the EIFS product the contractor uses have full code approval from the model code agency in its territory?*
  • 6. Does the contractor install only drainable systems?*
  • 7. Does the contractor have a process to document and correct nonconformance issues discovered in the building process?*
  • 8. Does the contractor perform a post-completion inspection to document any changes made to its original work? (e.g., installation of signs, lighting, or other attachments requiring holes through the system?)*
  • 10. Please provide a list of Applicant’s five (5) largest E.I.F.S. jobs or projects during the last three (3) years. Please disclose in detail:
    Rows
  • Should be Empty: